J Thomas in Munson is doing 31 things including…

remodel my bathroom

4 cheers

 

Sponsored Links

$5495 Bathroom Remodel

www.leadingrenovations.com/     1 Day Remodel. Materials & Labor. Call For Your Free Estimate Today.

Affordable Bath Remodel

www.qualitytubandtile.com/Bath_Remodel     Your Bath Remodel done in 1 Day Get a Bath Remodel for $3500

Remodel Bathroom

www.zelconstruction.com/     Contractor for Baths, Kitchens & More. Free Estimates. Call Us Now.

Bathroom Remodeling

www.angieslist.com/Remodeling     Remodeling Your Bathroom? Get Help. Review Companies at Angie's List.

Local Bath Remodeling

www.constructiondeal.com/     Find The Best Service Here. Get Multiple Free Quotes Instantly!

Bathroom Remodeling

www.internationalkitchen.com/     Quality, hassle free bath remodel. 33 years of experience to serve you

J Thomas has written 3 entries about this goal

Only a couple of days left...

apparently, giving myself a month to do this project was not nearly enough. Especially since I was either too sick (for about a week) or too tired (from managing my ENTIRE household because my wife was immobilized from knee surgery)!!! In any event, I’m still going to try and Get That Done, and finish this friggin’ bathroom as soon as possible.



What's left to do...

1. add towel holders to inset cabinets on either side.
1.5 put in shelves to existing cabinets
2. put in new light over sink
3. put in new light over shower
4. take out door to bedroom and put in a wall with a little door for putting clothes into hamper in next room
5. mud, sand, mud, sand some more
6. paint
7. put up wane scotting
8. put up new moldings
9. polyeurathane everything.

I think that’s about it…. I HOPE!



I have a lot of goals, but this seems like the best place to start.

I’ve started remodeling the bathroom before we moved into our new house in May of 2008. We pretty much gutted it when we found mold behind the bathtub and drywall. I took out the tub, built a small wall, and put in a one-piece tub/shower insert. I put in a new vanity and sink, more drywall and put in some linolium on the floor. It was finished about a month after we moved in (we got sidetracked with the birth of our daughter about a week after we moved in). Of course, having a baby pretty much halts any forward momentum I had for projects until the last few months. I have a lot of goals to accomplish this coming year (2010), so I figure I better get going and finish the ones I’ve already started. Recently, I’ve added a handmade cabinet that is inserted into the wall between the studs. It turned out very cool I thought. It even has a fold down seat that lets you sit in the shower (my wife tore her ACL and isn’t allowed to stand on her foot for 6 weeks, so she has to shower sitting down). Once she’s able to walk again, I’ll take the fold-out-of-the-wall shower seat out and put some shelves in. It works pretty cool, actually, but I’ll be excited to get it out of there and make the whole cabinet a little more functional.



J Thomas has gotten 4 cheers on this goal.

 

I want to:
43 Things Login