I plan on moving in December. The plumber has been busy for more than a month (don’t ask), there are still no electricity, and I definitely won’t be finished with everything, but I will be moving.
Owner Builder Loans
www.easyconstructionloan.com/ E-Z Owner Builder Construction Loan Borrow $100k to $1mil No Red Tape!
Homes in San Mateo
standardpacifichomes.com/San_Mateo Tour New Townhouses from the $550's Debuts: June 2 & 3 from 10am-5pm
UBuildIt-Tulsa
www.ubuildit.com/ National Leader In Lowest Cost to Build or Remodel
Painting By Armstrong
www.armstrong1234.com/ Exterior and Interior Home Painting Let Armstrong Transform Your Home
Finish Houses
www.target.com/ Finish Houses Online. Shop Furniture at Target.
Paint My House
www.remodelrepairreplace.com/Painting Local Home Painting Estimates Enter Zip & Get 3 Bids in Seconds
Konkoit has written 6 entries about this goal
Almost ready to have the plumbing finished. One little pesky basin stand that I forgot about and ended up getting something completely different but much better than I was planning on.
Finish welding up the frame for the basin. Managed to do it all wrong and had to grind it loose and reweld. Clean and paint next.
Did almost nothing this weekend. Was overwhelmed by events not planned. Did put on a few door handles.
For this week: Design and build frame for basin in bathroom, get a move on and buy two toilets.
Once I’ve done this the plumber can come and finish.
Time: finish this before 20 August 2006
I’ve been working on it for five years now, but now I am starting to reach the beginning of the end. Final glass was added today, house can now be locked completely. Now for the interior.
Konkoit has gotten 2 cheers on this goal.
YiSun1103 cheered this 5 years ago
Himinglaeva cheered this 5 years ago
