One crazy weekend! Got to the warehouse Friday afternoon. Built the set, tested lighting, and auido setup. Did final round of rehearsal on the same night. Got up 7am on Saturday, started shooting around 9AM. I totalled about 12 hours of sleep that weekend.
Now into post proudction! Editing, VFX, sound design, audio recording, folley, pickups, still more work ahead. Some production photos:
http://www.flickr.com/photos/42026939@N00/sets/72057594130675571/
May 19, 2006, 02:20PM PDT | 1 cheer | 0 comments
One most important thing I’ve learned after half way into the shooting is that all of your pre-production work will pay off during the actual production. The more preproduction work you do, the less problems you’re going to run into later. At this point I’m very happy with the end result. Moving onto the location 2, still a lot of work ahead, but I can see the light at the end of the tunnel. :)
Some sceen captures from location 1 shoot. Shot on two DVX100As.
Apr 14, 2006, 12:14PM PDT | 7 comments
The preproduction is almost done. Script has been finalized, storyboard has been drawn. Shot lists are made. Locations have been scouted. Only need to do a few rehearsals before the production begins. Fun, fun, fun.
Mar 03, 2006, 11:26AM PST | 0 comments