x lessons 1-5
x 6
7
8
9
10
11
12
x measure floor
x draw mock-up in psp
x take pics
x play with colors in PSP
x choose tile
x buy tile, grout, spacers
x borrow FILs tile cutter
x rip out old floor
~ do a trial fitting and cut tiles
1. Knitting
A. works done/in progress
B. ideas for future projects
2. Stained Glass
A. Works done/in progress
B. ideas for future projects
Had to frog about four inches of the sweater last night after I realized that I messed up my YO’s and lost two stitches. That would make the left side one full inch wider than the right, plus the yo looked like crap, so really I had no choice, but gawd, I hate ripping out my work. Watching The Soprano’s episodes 1 and 2 made it a little easier to bear.
x clean out catalog drawer
clean out CD drawer
~ clean out main desk drawer
declutter top of desk
~ declutter green cabinet
clean out cradle
move cradle to another room
~ declutter kids toys and books
hang message board and circle picture
clean out junk corner
move old computer to dining room
Yarn: Artful Yarns’ Dance in colorway Macarena (pink and cream)
I have six days until my finishing class and I still have to finish the front piece (currently 2/3 done) and make the sleeves. The back piece (the biggest) is already done.