One crazy weekend! Got to the warehouse Friday afternoon. Built the set, tested lighting, and auido setup. Did final round of rehearsal on the same night. Got up 7am on Saturday, started shooting around 9AM. I totalled about 12 hours of sleep that weekend.
Now into post proudction! Editing, VFX, sound design, audio recording, folley, pickups, still more work ahead. Some production photos:
http://www.flickr.com/photos/42026939@N00/sets/72057594130675571/
May 19, 2006, 02:20PM PDT | 1 cheer | 0 comments
One most important thing I’ve learned after half way into the shooting is that all of your pre-production work will pay off during the actual production. The more preproduction work you do, the less problems you’re going to run into later. At this point I’m very happy with the end result. Moving onto the location 2, still a lot of work ahead, but I can see the light at the end of the tunnel. :)
Some sceen captures from location 1 shoot. Shot on two DVX100As.
Apr 14, 2006, 12:14PM PDT | 7 comments
Cycling is a part of my life. 50 mile winter loop through the redwoods in nor-cal, 85 mile summer loop to the beach and back, add a few organized centuries, I log about 3000 mile a year on my bike.
So it’s not really about i’ve finished “ride my bike”, it’s all about keep doing it.
Ride on!
http://www.myspokes.com
Mar 10, 2006, 12:12AM PST | 0 comments