Update
We ordered the windows and they are due to ship by middle of next week. Whoot!
The Library has been painted! (not the color of the picture)
The Living Room has been patched and primed.
Room Status
Dining Room has been stripped, patched, painted, and the carpet has been removed. Needs: crown molding, wood floor refinished, cracked tile work on mantle redone.
Library has been stripped, patched, primed, and painted. Needs: Carpet pulled, and wood floor refinished.
Living Room has been striped, patches, and primed. Needs: Painted, carpet pulled, and wood floor refinished.
Kitchen eventually needs completely gutted to match better with house and updated. (Cosmetic Only)
Laundry/DSBathroom needs floor plan reconfigured eventually. (Cosmetic and Convenience)
Stairs need refinished and patching in walls.
Master needs stripped, patched, primed, painted, molding piece fixed, carpet pulled, and wood floor refinished.
Guest Room needs carpet pulled and wood floor refinished.
Laura’s Office has carpet pulled. Needs tile extracted from inside closet to patch dining room mantle, closet painted, and wood floor refinished.
Eric’s Office has been painted. Needs carpet pulled, and wood floor refinished.
Basement water needs to be gone. Sump pump, removal of plastic and cinder blocks. (WTF were they thinking?)
Attic needs finished fully down the road.
Exterior Status
Siding needs new siding.
Windows have been ordered and are expected soon.
Roof needs painted or tarred.
Gutters need to be put on.
Porch needs railing redone and columns. (Cosmetic)
Back Deck needs to be ripped out and rebuilt. Rotting wood.
Garage needs resided with house and flower box removed. Rotting wood in box and termite trap.
Dead Tree needs taken down.
Lawn needs to be eventually grated away from house.